Product Detail :
|
Fabrication and supply for (a) replacement of existing steel bridge girder of bridge number 105 span 2x18.3 in rqj-noq section under the jurisdiction of sse/br/sguj; (b)replacement of 12.2m span of existing steel bridge girder of bridge number 50 span 5x12.2m in rqj-noq section under the jurisdiction of sse/br/sguj; (c) replacement of 12m span of existing steel bridge girder of bridge number 101(span 4x12.2m) in rqj-noq section and 40a (span 1x12.2m) in rqj-hdb section under the jurisdiction of sse/br/sguj; (d) replacement of steel bridge girder of br. no. 6 (1x18.3m) at km 12/8-9 on the section fkm-dbb; (e) replacement of steel bridge girder of br. no. 184 (3x18.3m) at km 196/0-1 on the section lmg-tsk; (f) replacement of steel bridge girder of br. no. 574 (5x12.2) at km 520/7-9 on the section lmg-tsk and (g) replacement of steel bridge girder of br. no. 20 (3x12.2m) at km 30/6-7 & br. no. 7 (3x12.2m) at km 14/6-7 on the section fkm-dbb.
|