Product Detail :
|
a) Design and build all components of the drinking water supply system including water treatment plant for 1 cluster of output capacity of 30 mld (1. tapping point bhuchara kalan for 99 villages), clear water & raw water pumping station along with pumping machineris, clear water transmission mains up to ohsr of existing villages water works to achieve the required head, installation of bulk water meters, silent generator, transformer, scada/plc, etc. for new facility for providing bulk syooly of water to various villages of blocks on dbot basis. b) operation and maintenance of the scheme built including all structures & appurtenance constructed/ installed, scada, pipelines laid for the supply of treated surface water at required pressure, quality and quantit to all the ohsrs in the villages etc. and supply of treated surface water to various villages of blocks.
|